Graves Hall
Project Summary
Hope called Parkway to help bring the community classic, Graves Hall, into the twenty-first century. The job included replacing all of the existing knob and tube wiring of the late 1800's, installing electric shades, a drop down A/V screen, extensive lighting dimming systems, and finally, putting the right light on Hope's irreplaceable collection of paintings: large oils of Hope's previous school presidents.
Feedback
ABC Award Winner
Key Challenges
The first task, replacing the wiring, included two challenges: We had to penetrate three-foot thick limestone, brick and concrete walls covered in 2-inch thick bamboo reinforced plaster for new conduit runs for feeder and branch circuits. And we had to it without interrupting Hope's phone service. With the exception of a scheduled ten-minute power outage, the phone system functioned without interruption throughout the project.
The other improvements included a request we get a lot: respect the aesthetic environment. We did. And even though drop down A/V screens were rare in the 1800's, we did a nice job making ours feel comfortable in this classic hall. Finally, we lit the president paintings with specialized luminaries, designed with adjustable shutters and mounted inconspicuously above a cloud ceiling. Net effect? A grand history in a very flattering light.
- Graves Hall
Budget: $420,000 - Gentex Electrical
Budget: Not Disclosed - Martha Miller Electrical
Budget:$400,000 - DeVos Fieldhouse Electrical
Budget:$1,200,000 - Resurrection Life Electrical
Budget: $4,500,000 - Wyoming Waste Electrical
Budget: $4,600,000 - Leprino Foods Electrical
Budget: $4,850,000 - Haworth Electrical
Budget: $5,000,000